Operating Instructions

These operating instructions specify the correct usage of the Cerrowire®️ Reel-N-Reel. These guidelines are unique to setting up the Reel-N-Reel for optimum performance and safe use. Failure to follow these instructions may result in personal injury or harm and void any guarantees.

Steps for Loading

STEP 1

Load the Reel-N-Reel so the take-up rotation is the opposite direction of the arrow on the outer flange.

Figure A

STEP 2

Insert a drive pin through the outer and inner flanges to engage the reel with the take-up machine and center spindle mechanism. Ensure the drive pin is long enough to engage the inner reel, without protruding into the traverse.

Figure B

STEP 3

Insert your wire tail into one of three holes in the hub that best retains the wire end.

Figure B

PRO TIP #1

Use the heavy-duty pallet to position the Reel-N-Reel into the take-up machine, then unstrap the reel from the pallet. The pallet can remain under the reel during winding. Return the reel to the pallet and secure.

Steps for Payout

STEP 1

Position the reel and cradle pallet at the pull site. Orient so the direction of pull follows the directional arrow on the outer flange.

Figure O

STEP 2

If leaving the reel on the cradle pallet: Remove the straps. Begin pulling wire off of the inner reel.

Figure P

STEP 3

If removing the reel from the cradle pallet: Cut the straps and use a forklift to remove the Reel-N-Reel from the pallet. Chock the outer flanges on both the front and back sides. Begin pulling wire off of the inner reel.

Figure Q

WHEN FINISHED

After pulling is complete, return the Reel-N-Reel and strap it to the cradle pallet.

MORE INFORMATION

Visit the Cerrowire innovations page for more information about Reel-N-Reel.